Tuesday, January 6, 2009

A few quick items to cover today.
I recently found out that we are having the same problem with the electric running to the front nine rest room as we had with the back nine rest room. The wiring is so old that it is Aluminum wiring. I've never even heard of Aluminum wire before we redid the back nine rest room. It was also originally installed without running it in conduit. It's amazing that it lasted near this long. Anyway, I have kind of taken over the project and we are running a wire from one of my irrigation controllers to the building to at least get the lights working temporally.

We still have not gotten the cart path on number 8 finished up, because of having to switch to the rest room project. But hopefully, we can get it done later this week or early next week. I'm going to head to the store to pick up the concrete we need as soon as I finish this. I need to pick up some paint also, because we still need to get the stripes painted on the cart paths at the 200, 150, 100 and Falls Course yardages.

Boy, doesn't it seem like the Geese have been coming in droves lately. We have been trying to get Harry out in the evenings with the dog, but we have been so short handed that it is difficult to let him off early in the day to take the dog out in the evening. Although, Harry has been taking Badge out occasionally on his own time. We will also continue with the airplanes in the afternoon to try to harass the birds as much as we can. He should be able to start coming out on a more regular basis now that the holidays are over.

No comments: